10/01/2025 - Approval to adopt Romford Masterplan Supplementary Planning Document as planning policy.
Approval for the formal Adoption of the Romford Town
Centre Masterplan Supplementary Planning Document.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Lauren Miller
Notice of decision: 10/01/2025
Anticipated restriction: Open
09/01/2025 - Approval to initiate a procurement process via the ESPO framework for green fuel (HVO) alternative to GTL for the councils vehicle fleet.
Initiate a procurement process via ESPO framework for the provision of HVO fuel for the Council’s fleet.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Simon Blake
Notice of decision: 21/01/2025
Anticipated restriction: Open
09/01/2025 - Temporary Accommodation Strategy (2025)
Cabinet will be asked to approve the Temporary Accommodation Strategy (2025)
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Joe Agius
Notice of decision: 14/01/2025
Anticipated restriction: Open
09/01/2025 - Roof Replacements 24/25 - Award Of Contract
On 25 September, 2024, Cabinet delegated authority to the Strategic Director of Place to award the contract for the roof replacements to Council properties following a successful tender exercise
Decision Maker: Strategic Director, Place
Decision due date: Not before 13/02/2025
Lead officer: Husnain Mazhar
Notice of decision: 13/01/2025
Anticipated restriction: Part exempt
09/01/2025 - Permission to enter into a s75 Agreement with the Havering Place-Based Partnership to deliver the Better Care Fund 2025-2027
Permission to enter into a s75 Agreement with the Havering Place-Based Partnership to deliver the Better Care Fund 2025-2027
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/01/2025
Anticipated restriction: Open
06/01/2025 - Approval to commence a Direct Award for supported housing services for care leavers 18-25 years in new build at Mawneys Close
We are looking to award an 18 month contract to a care & support provider
via a Direct Award.
The duration of the contract will then allow for the Council to implement a full
procurement exercise and award a new contract to the winning provider
when the 18 month contract ends.
Permission to waive Contract Procedure Rules will be sought separately.
Decision Maker: Strategic Director, People
Decision due date: Not before 13/02/2025
Lead officer: Charles Ryan
Notice of decision: 06/01/2025
Anticipated restriction: Open
06/01/2025 - Approval to commence a Direct Award for supported housing services for young adults with learning disabilities aged 18-49 years in new build at Mowbrays Close
We are looking to award an 18 month contract to a care & support provider
via a Direct Award.
The duration of the contract will then allow for the Council to implement a full
procurement exercise and award a new contract to the winning provider
when the 18 month contract ends.
Permission to waive Contract Procedure Rules will be sought separately.
Decision Maker: Strategic Director, People
Decision due date: Not before 13/02/2025
Lead officer: Charles Ryan
Notice of decision: 06/01/2025
Anticipated restriction: Open
30/12/2024 - Implementation of Havering Early Education and Childcare Provider Directory and Funding Agreement
To implement Havering Early Education and Childcare
Provider Directory and Funding Agreement 2025-2030
Decision Maker: Strategic Director, People
Decision due date: Not before 13/02/2025
Lead officer: Pooneeta Mahadeo
Notice of decision: 30/12/2024
Anticipated restriction: Open
20/12/2024 - Permission to procure an Ageing Well Prevention Service
Havering Council and Havering Integrated Care Board have a number of individual prevention services that support our older and frail population. This includes support with wellbeing, building and maintaining independence, social inclusion, community advocacy, signposting and reduction in hospital admissions.
There are some overlaps between these services which is not providing best Value For Money and leading to a confusing end user experience. All prevention services are being reviewed with the aim of designing one overarching Ageing Well Prevention Service to deliver the current needs of an ageing population.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Sophie Barron
Notice of decision: 20/12/2024
Anticipated restriction: Open
19/12/2024 - Highfield Towers Phase 1 - renewal of cladding
Approval to seek tenders for the works to renew the cladding.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: James Johnson
Notice of decision: 19/12/2024
Anticipated restriction: Open
13/12/2024 - 2025/26 Budget and 2025-2029 Medium Term Financial Strategy
· Recommendation to Council to approve the 2025/26 budget and 2025-29 Medium Term Financial Strategy.
· Recommendation to Council regarding proposed Council Tax levels for 2025/26
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Richard Tyler
Notice of decision: 13/12/2024
Anticipated restriction: Open
11/12/2024 - Damp and Mould Policy (2025)
Cabinet will be asked to approve the Damp & Mould policy in accordance with the Regulator’s requirments.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Ian Saxby
Notice of decision: 06/01/2025
Anticipated restriction: Open
11/12/2024 - Permission to award the framework for Adult Social Care - Care Home, Homecare & Supported Living Placements
Cabinet will be asked to approved the award of the framework contract for Adult Social Care - Care Home, Homecare & Supported Living Placements
Decision Maker: Cabinet
Decision due date: 07/05/2025
Lead officer: Laura Wheatley
Notice of decision: 24/12/2024
Anticipated restriction: Open
11/12/2024 - Permission to procure a framework for Adult Social Care- Care Home, Homecare & Supported Living Placements
Cabinet will be asked to grant permission to procure a framework for Adult Social Care in Care Home, Homecare & Supported Living Placements.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Laura Wheatley
Notice of decision: 24/12/2024
Anticipated restriction: Open
11/12/2024 - Permission to re-procure Carers Hub contract
The current Carers Hub contract is expiring on 31st January 2026. Work is underway to review the service and develop a new service specification ready for a procurement exercise to take place in Summer 2025.
Decision Maker: Strategic Director, People
Decision due date: Not before 13/02/2025
Lead officer: Sophie Barron
Notice of decision: 20/12/2024
Anticipated restriction: Open
11/12/2024 - Havering All-Age Suicide Prevention Strategy 2025-30
Cabinet will be asked to adopt the new All-Age Suicide Prevention Strategy (2025-2030)
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Samantha Westrop
Notice of decision: 17/12/2024
Anticipated restriction: Open
11/12/2024 - To accept Physical Capacity funding from the NHS
The acceptance of the NHS Physical Capacity Funding to reduce hospital admissions, reduce delays in hospital discharges and to support key supported housing projects and winter communications.
Decision Maker: Strategic Director, People
Decision due date: Not before 06/02/2025
Lead officer: Sophie Barron
Notice of decision: 13/12/2024
Anticipated restriction: Open
10/12/2024 - Children's Social Care Yearly Uplift - Children's Social Care Contracts
Approval to implement the Children's Social Care Yearly Uplift for Children's Social Care Contracts
Decision Maker: Director Children's Services
Decision due date: Not before 27/03/2025
Lead officer: Simon Brown
Notice of decision: 10/12/2024
Anticipated restriction: Part exempt - view reasons
10/12/2024 - Delegation of Individual Child Care Fee Uplifts to the Director of Children's Services and their appointed officers
Approval to delegate Individual Child Care Fee Uplifts to the Director of Children’s Services and their appointed officers.
Decision Maker: Director Children's Services
Decision due date: Not before 27/03/2025
Lead officer: Simon Brown
Notice of decision: 10/12/2024
Anticipated restriction: Part exempt - view reasons
10/12/2024 - Children's Social Care Yearly Uplift - Direct Payments
Approval to implement Children’s Social Care Yearly Uplift for Direct Payments
Decision Maker: Director Children's Services
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Supported Living
Approval to implement Adult Social Care Yearly Uplift for Supported Living
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Specialist Day Services
Approval to implement Adult Social Care Yearly Uplift for Specialist Day Services
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Specialist Residential & Nursing Care
Approval to implements Adult Social Care Yearly Uplift for Specialist Residential & Nursing Care
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Older Persons Residential & Nursing Care
Approval to implement Adult Social Care Yearly Uplift for Older Persons Residential & Nursing Care
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Homecare
Appoval to implement Adult Social Care Yearly Uplift for Homecare
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Direct Payments
Approval to implement Adult Social Care Yearly Uplift for Direct Payments
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Open
10/12/2024 - Adult Social Care Yearly Uplift - Adult Social Care Contracts
Approval to action Adult Social Care Yearly Uplift for Adult Social Care Contracts
Decision Maker: Strategic Director, People
Decision due date: Not before 27/03/2025
Lead officer: Laura Wheatley
Notice of decision: 10/12/2024
Anticipated restriction: Part exempt - view reasons
28/11/2024 - Secure funding for the build of Aldwych Close (New build of an In-borough Residential Care Home and Short Breaks Facility for Children with SEND and Subsequent Care Service Provision)
Secure funding for the build element of Aldwych Close - Build provisional date in Q3 25-26 and completion is Q3 26-27.
(Some history to the proposed scheme below)
The proposed 6-bed facility will be divided into:
4-bed unit allocated to overnight and weekend short breaks
2-bed bed unit allocated to long term residential placements
In 2023, after the resumption of the project, there was an opportunity to receive match capital funding for the scheme through a DfE sponsored process. A submission was made but unfortunately rejected because the scheme would not be dealing with looked after children alone.
Increases in capital costs for building projects has meant that the scheme is
more expensive than originally envisaged. It is therefore incumbent for us to
return to Cabinet with an updated business case to get approval for the
expenditure and to show that benefits will still accrue. The business case is now available to scrutinise.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Charles Ryan
Notice of decision: 28/11/2024
Anticipated restriction: Open
22/11/2024 - Acceptance of Section 31 Grant for Simpler Recycling
Acceptance of £1.894m capital grant funding from DEFRA for the introduction of household food waste collections in Havering.
Decision Maker: Director of Environment
Decision due date: Not before 13/02/2025
Lead officer: Jacki Ager
Notice of decision: 22/11/2024
Anticipated restriction: Open
20/11/2024 - Contract Award for the Supply of Temporary Workers
Cabinet will be asked to approve the award of contract for the provision of temporary workers
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Euan Beales
Notice of decision: 20/11/2024
Anticipated restriction: Part exempt - view reasons
18/11/2024 - Outline Proposals to address Early Years, Primary, Secondary and SEND rising rolls – Update to Phase 5 expansion Programme
Officers to outline proposals to address Early Years, Primary, Secondary and
Special Educational Needs and Disability rising rolls – Update to Phase 5 expansion Programme.
Cabinet to approve selected proposals.
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Pooneeta Mahadeo
Notice of decision: 18/11/2024
Anticipated restriction: Part exempt
11/11/2024 - Acquisition of Property in Rainham for the GLA Council Housing Acquisition Programme
To secure permission for the acquisition of new build property for the Council Housing Acquisition Programme
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Mark Butler
Notice of decision: 28/11/2024
Anticipated restriction: Part exempt - view reasons
11/11/2024 - Mercury Land Holdings Business Plan Update 2025/26
To agree to revisions to the Mercury Land Holdings business plan including budget profiles
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Mark Butler
Notice of decision: 28/11/2024
Anticipated restriction: Part exempt - view reasons
11/11/2024 - Approval to commence procurement for Frozen Food and Grocery
HES Catering services is seeking approval to commence a procurement process to set up a Procurement Across London (PAL) framework for frozen food and grocery.
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Sarah Hales
Notice of decision: 25/11/2024
Anticipated restriction: Open
08/11/2024 - Contract Extension for Semi – independent support service. Widecombe/Park End.
Permission to award a contract extension for 18 months for the Semi- Independent Support Service Widecombe/Park End. The extension will be from 1/9/2024 - 28/2/2026.
In order to avoid the need for a future waiver a procurement process will
commence in December 2024 giving us sufficient time to tender, award and
mobilise the new contract. This work will include completing a PIF and then
working with procurement to develop a procurement plan along with the support of a Project Board to produce the key tender documents and evaluate the bids.
Decision Maker: Director, Starting Well
Decision due date: Not before 13/02/2025
Lead officer: Charles Ryan
Notice of decision: 08/11/2024
Anticipated restriction: Open
04/11/2024 - Office to Residential Conversion to accommodate homeless families - Eastgate House
Cabinet will be asked to :
· Approve the proposal to enter into an agreement for lease with NHG for the sole use and occupation of Eastgate House, a 34 unit building in Basildon,under which the Council will be obliged to take a 10 year less a day lease of Eastgate House upon completion by NHG of refurbishment works.
· Approve the Council entering into an underlease with Queens Letting and Management (QLM), a community interest company once established, for Eastgate House on a back to back basis.
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Darren Alexander
Notice of decision: 04/11/2024
Anticipated restriction: Open
30/10/2024 - Bridge Close Regeneration LLP Business Plan Update 2025-26
For cabinet to agree the 2025-26 business plan for Bridge Close
Regeneration and any other recommendations set out in the
report.
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Nick Gyring-Neilsen
Notice of decision: 30/10/2024
Anticipated restriction: Fully exempt
30/10/2024 - Access to Homes Policy (2025)
Cabinet will be asked to approve the 'Housing Customer Standards policy' in order to align standards with corporate values
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Joe Agius
Notice of decision: 30/10/2024
Anticipated restriction: Open
29/10/2024 - Council Tax base 2025/26
Setting the Council Tax base for 2025/26
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Richard Tyler
Notice of decision: 29/10/2024
Anticipated restriction: Open
28/10/2024 - Education Funding
- revised approach to funding and rates of High Needs
Pupils in special units and mainstream schools
- update on the Delivering Better Value programme
- - approval in principle of Schools funding formula (final
figures to be confirmed in February MTFS paper)
- new approach to management of schools in deficit
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Katherine Heffernan
Notice of decision: 28/10/2024
Anticipated restriction: Open
24/10/2024 - Permission to implement domestic food waste collections and delegate purchasing
Permission to delegate purchase of food waste caddies/food
waste vehicles to Director of Environment Imran Kazalbash
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Jacki Ager
Notice of decision: 24/10/2024
Anticipated restriction: Open
18/10/2024 - Mayor's Office for Policing and Crime London Crime Prevention Fund Grant Acceptance
To approve the Mayor's Office for Policing and Crime London Crime Prevention Fund grant for 2025-29
Decision Maker: Strategic Director, Place
Decision due date: Not before 27/03/2025
Lead officer: Diane Egan
Notice of decision: 18/10/2024
Anticipated restriction: Open
16/10/2024 - Violence Against Women and Girls (VAWG) Strategy & Action Plan 2025 - 2029
Cabinet will be asked to approve a 4 year Violence Against Women & Girls Strategy Action Plan.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Kerry Wright
Notice of decision: 16/10/2024
Anticipated restriction: Open
14/10/2024 - Acceptance of Additional Grant from the Greater London Authority for Regeneration Schemes
Accept and allocate additional grant funding from the Greater London Authority (GLA) for regeneration projects delievering affordable housing for local people
Decision Maker: Strategic Director, Place
Decision due date: Not before 13/03/2025
Lead officer: Kirsty Moller
Notice of decision: 14/10/2024
Anticipated restriction: Part exempt - view reasons
08/10/2024 - Libraries Consultation
Cabinet will be asked to agree next steps for libraries and potential closures following the recent libraries public consultation.
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Guy Selfe
Notice of decision: 08/10/2024
Anticipated restriction: Part exempt - view reasons
02/10/2024 - Approval to extend windows and doors contract
Approval to 1 year extension to existing contract with Equans for renewal of windows and doors in HRA properties, as permitted by initial approval
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Mark Howard
Notice of decision: 02/10/2024
Anticipated restriction: Part exempt - view reasons
30/09/2024 - HRA Business Plan Update 2025-2055
Cabinet will be asked to agree the Housing Revenue Account business plan update and set HRA budgets in accordance with the report.
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Paul Walker
Notice of decision: 30/09/2024
Anticipated restriction: Part exempt - view reasons
15/08/2024 - Provision of temporary homes for the Waterloo Estate
To confirm arrangements for temporary homes on the Waterloo Estate
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: Maria Faheem
Notice of decision: 15/08/2024
Anticipated restriction: Part exempt - view reasons
02/07/2024 - Building safety works to lifts at four high-rise blocks
Approval to vary the high-rise lift upgrade contract by the addition of building safety works to the lifts at four other high-rise blocks
Decision Maker: Strategic Director, Place
Decision due date: Not before 30/01/2025
Lead officer: James Johnson
Notice of decision: 02/07/2024
Anticipated restriction: Open
01/07/2024 - Tenancy Policy
Cabinet will be asked to approve the implementaiton of the new Tenancy Policy
Decision Maker: Cabinet
Decision due date: 22/01/2025
Lead officer: James Delaney
Notice of decision: 01/07/2024
Anticipated restriction: Open
24/06/2024 - Street Naming and Numbering Policy
A decision to approve a revised Street Naming and Numbering Policy
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Hayley Ayris
Notice of decision: 24/06/2024
Anticipated restriction: Open
13/06/2024 - Award of contract to re-roof the Havering Town Hall and associated works
Authority to award a contract to re-roof the Havering Town Hall and associated works
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Nicola Prandini
Notice of decision: 13/06/2024
Anticipated restriction: Part exempt - view reasons
18/04/2024 - Children in Care Sufficiency Strategy
Cabinet will be asked to agree the Children in Care Sufficiency Strategy
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Simon Brown
Notice of decision: 18/04/2024
Anticipated restriction: Open
31/01/2024 - Bridge Close Regeneration - Proposed Making of the Planning Compulsory Purchase Order
Cabinet will be asked to consider the Compulsory Purchase Report and delegate authority to the relevant Cabinet Member/Officers to make the compulsory purchase order for the Bridge Close regeneration scheme at the appropriate time.
Decision Maker: Cabinet
Decision due date: 12/03/2025
Lead officer: Nick Gyring-Neilsen
Notice of decision: 31/01/2024
Anticipated restriction: Part exempt
14/02/2023 - Havering Wates Regeneration LLP - 2024-2026 Business Plan Update
Cabinet will be asked to agree the Havering Wates Regeneration LLP - In-Year Review of 2023/24 Business Plan
Decision Maker: Cabinet
Decision due date: 05/02/2025
Lead officer: Maria Faheem
Notice of decision: 14/02/2023
Anticipated restriction: Part exempt - view reasons
26/08/2022 - Release of Funding to Bridge Close Regeneration LLP to Enable Acquisition of Relocation Property
Release of Funding to Enable Acquisition of Relocation Property
Decision Maker: Leader of the Council
Decision due date: Not before 29/05/2025
Lead officer: Nick Gyring-Neilsen
Notice of decision: 26/08/2022
Anticipated restriction: Part exempt - view reasons