Agenda item
Approval to go out to consultation on the East London Joint Waste Plan
Decision:
Report: Approval to consult on the East London Joint Waste Plan
Presented by: Councillor Williamson, Cabinet Member for Regeneration
Cabinet
Agreed the publication of the Draft East London Joint Waste Plan and associated documents (attached as Appendix 1, 2, 2.1 and 3) for at least a 6-week period of statutory public consultation under regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012, with an anticipated start date in late July 2024
Minutes:
Report: Approval to consult on the East London Joint Waste Plan
Presented by: Councillor Williamson, Cabinet Member for Regeneration
Summary
This report seeks approval to consult on the Draft East London Joint Waste Plan (ELJWP). The ELJWP has been produced jointly with Redbridge, Newham, and Barking and Dagenham. It is an update to the previously adopted Joint Waste Plan (2012). Consultation is proposed to start in late July and run for a minimum of 6 weeks, in accordance with Regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012.
Cabinet
Agreed the publication of the Draft East London Joint Waste Plan and associated documents (attached as Appendix 1, 2, 2.1 and 3) for at least a 6-week period of statutory public consultation under regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012, with an anticipated start date in late July 2024
Supporting documents:
- 10.0 Cabinet report - approval to consult on ELJWP Final, item 212. PDF 357 KB
- 10.1 Appendix 1 - ELJWP Regulation 18 draft, item 212. PDF 2 MB
- 10.2 Appendix 2 - ELJWP Regulation 18 draft - Integrated impact assessment, item 212. PDF 11 MB
- 10.3 Appendix 2.1 - ELJWP Regulation 18 draft - Habitats Regulations Assessment, item 212. PDF 9 MB
- 10.4 Appendix 3 - ELJWP Consultation Protocol, item 212. PDF 697 KB
- Supp agenda - Appendix 1.1 - ELJWP Regulation 18 draft (appendix 2 Safeguarded Sites), item 212. PDF 4 MB