Agenda item

Approval to go out to consultation on the East London Joint Waste Plan

Decision:

Report: Approval to consult on the East London Joint Waste Plan

 

Presented by: Councillor Williamson, Cabinet Member for Regeneration

 

Cabinet

 

Agreed the publication of the Draft East London Joint Waste Plan and associated documents (attached as Appendix 1, 2, 2.1 and 3) for at least a 6-week period of statutory public consultation under regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012, with an anticipated start date in late July 2024

 

Minutes:

Report: Approval to consult on the East London Joint Waste Plan

 

Presented by: Councillor Williamson, Cabinet Member for Regeneration

 

Summary

 

This report seeks approval to consult on the Draft East London Joint Waste Plan (ELJWP). The ELJWP has been produced jointly with Redbridge, Newham, and Barking and Dagenham. It is an update to the previously adopted Joint Waste Plan (2012). Consultation is proposed to start in late July and run for a minimum of 6 weeks, in accordance with Regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012.

 

Cabinet

 

Agreed the publication of the Draft East London Joint Waste Plan and associated documents (attached as Appendix 1, 2, 2.1 and 3) for at least a 6-week period of statutory public consultation under regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012, with an anticipated start date in late July 2024

 

Supporting documents: