Decision details
Proposed Submission East London Joint Waste Plan for Consultation (Regulation 19)
Decision Maker: Cabinet
Decision status: Recommendations Approved (subject to call-in)
Is Key decision?: Yes
Is subject to call in?: Yes
Purpose:
Approval to consult on the Proposed Submission East London
Joint Waste Plan (Regulation 19)
Decision:
Cabinet:
1. Agreed the publication of the Proposed Submission East London Joint Waste Plan and supportingdocuments (attached as Appendix 1-16)for at least a 6-week period of statutory public consultation under Regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations 2012, with an anticipated start date in late May 2025.
2. Approved the new Local Development Scheme for publication (Appendix 17)
3. Delegated authority to the Assistant Director of Planning, following consultation with the Cabinet Member for Regenerationto:
i.Make non material amendments to the Proposed Submission version ahead of publication under Regulation 19
ii.Approve future iterations of the Local Development Scheme as required
Report author: Cara Collier
Publication date: 10/04/2025
Date of decision: 09/04/2025
Decided at meeting: 09/04/2025 - Cabinet
Date comes into force if not called in: 17/04/2025
Call-in deadline date: 16/04/2025
Current call-in Count: 0
Accompanying Documents:
- 10.0 Cabinet report - Proposed submission ELJWP (Reg19 consultation)
PDF 338 KB
- 08.01 Appendix 1 - Proposed Submission ELJWP
PDF 2 MB
- 08.02 Appendix 1a - Proposed Submission ELJWP - Appendix 3 Maps of Safeguarded Sites
PDF 6 MB
- 08.03 Appendix 2 - Proposed Submission ELJWP - IIA
PDF 4 MB
- 08.04 Appendix 3 - Habitats Regulations Assessment of the Proposed Submission ELJWP
PDF 8 MB
- 08.05 Appendix 4 - ELJWP IIA Scoping Report_Feb2024
PDF 34 MB
- 08.06 Appendix 5 - Consultation Statement
PDF 1 MB
- 08.07 Appendix 6 - Updated Consultation Protocol (reg19)
PDF 839 KB
- 08.08 Appendix 7 - Duty to Cooperate Statement of Compliance
PDF 2 MB
- 08.09 Appendix 8 - Note on Sites identified for release
PDF 247 KB
- 08.10 Appendix 9 - Circular Economy Topic Paper
PDF 550 KB
- 08.11 Appendix 10 - Climate Change Topic Paper
PDF 2 MB
- 08.12 Appendix 11 - Waste Management Topic Paper
PDF 2 MB
- 08.13 Appendix12 - Waste Management Capacity in East London Report
PDF 2 MB
- 08.14 Appendix13 - Hazardous Waste Baseline and Arisings Report
PDF 624 KB
- 08.15 Appendix14 - CDEW Baseline and Arisings Report
PDF 962 KB
- 08.16 Appendix15 - Strategically Significant Cross Boundary Waste Movements
PDF 1 MB
- 08.17 Appendix16 - SFRA Position Statement
PDF 365 KB
- 08.18 Appendix17 - Havering Local Development Scheme 2025 - 2027
PDF 598 KB