17/04/2018 - Bretons Manor House, Tudor barns, outbuildings and walled garden - Applications for Grant Funding

The Leader of the Council will be asked to approve an application for funding to support the regeneration of the Bretons Manor House, Tudor barn, outbuildings and walled garden. The application is for funding amounting to £4m to Heritage Lottery Funding (approximately £2m for ‘Heritage Grants’ and for £2m for ‘Heritage Enterprise Grants’) to assist with the proposed regeneration project for Bretons Manor House, Tudor barns, outbuildings and walled garden.

 

Decision Maker: Leader of the Council

Decision due date: Not before 26/04/2018

Notice of decision: 17/04/2018

Reason for urgency:
This matter is being added by way of general exception as the full 28 day period of notice is not being given. This is because a decision is needed to meet deadlines which if not met will mean that possible grant funding will be lost. This will not be in the best interests of the Council or residents who will benefit from this development. There is no Cabinet meeting until June 2018 and therefore a decision is being requested from the Leader of the Council.

Anticipated restriction: Open


17/04/2018 - Implementation of Phase 4 expansion programme - Redden Court Secondary school expansion - Decision to increase funding

Further to the Cabinet decision to implement the phase 4, school expansion programme in October 2016 and the subsequent decision by the Cabinet Lead Member allocating funding, the Leader of the Council will be asked to make a decision to increase the funding for the Redden Court School Expansion.

Decision Maker: Leader of the Council

Decision due date: Not before 26/04/2018

Lead officer: Pooneeta Mahadeo

Notice of decision: 17/04/2018

Reason for urgency:
This matter is being added under general exception as the decision is needed urgently without giving the full 28 day notice period. This is due to the fact that the Education, Skills and Funding Agency need to procure the works for the development. The ESFA confirmed on 9th April that the authority can now use Basic Need for this project as the additional accommodation requested is not beyond the area guidelines of what the school require for a 2FE expansion which has led to the requirement of etra funding. The matter needs to be dealt with urgently as there is not a Cabinet meeting until June and the works are essential to ensure provision for the new school year.

Anticipated restriction: Open


11/04/2018 - Extensions and Refurbishments to the Robert Beard Centre for the Pupil Referral Service

The Director of Childrens Services will be asked to grant authority to enter in to a contract for extension and refurbishment works for the Pupil Referral Service to the Robert Beard Centre

Decision Maker: Director Children's Services

Decision due date: Not before 26/04/2018

Lead officer: Andy Skeggs

Notice of decision: 11/04/2018

Reason for urgency:
This matter is being added by way of general exception to allow for an expedited decision to ensure provision is in place for the new school year. Members of the pubic will still be able to comment on this matter ahead of the decision if so desired but will not have the full 28 day period usually given.

Anticipated restriction: Open


07/03/2018 - Extension of the Targeted Information, Advice and Guidance Service Contract

The Director of Children Services will be asked to approve a 19 month extension of the contract. The extended contract will expire on 31st March 2020 (the service will be re-commissioned in 2019).

Decision Maker: Director Children's Services

Decision due date: Not before 26/04/2018

Wards affected: (All Wards);

Lead officer: Daren Mulley

Notice of decision: 07/03/2018

Reason for urgency:
This matter is added by way of general exception on the basis that the notice period available to the public is less than the prescribed 28 days. The contract extension will maintain the status quo and allow services to continue.

Anticipated restriction: Open


07/03/2018 - Contract award for the Provision of the Integrated Sexual Health Service

Cabinet will be asked to award the contract for the provision of the Integrated Sexual Health Service.  The contract value will be in excess of £10 million.

Decision Maker: Cabinet

Decision due date: 13/06/2018

Wards affected: (All Wards);

Lead officer: Daren Mulley

Notice of decision: 07/03/2018

Anticipated restriction: Part exempt  - view reasons


07/03/2018 - Main Insurance Contract Award

Cabinet will be asked to award the contract for the Council’s main insurance contract for classes of business including property, motor, liabilities and ancillary policies excluding engineering inspection.  The existing contract expires on 30th June, 2018.  The new contract is proposed for 6 years with an option to extend.  The estimated value of the contract is in excess of £10 million

 

Decision Maker: Cabinet

Decision due date: 13/06/2018

Wards affected: (All Wards);

Lead officer: Paula McLoughlin

Notice of decision: 07/03/2018

Anticipated restriction: Part exempt  - view reasons


06/03/2018 - Employment and Skills Plan

Further to the decision in February, 2019, Cabinet will asked to approve the Council’s new Employment and Skills Plan

 

Decision Maker: Cabinet

Decision due date: 11/04/2018

Lead officer: Phillipa Brent-Isherwood

Notice of decision: 06/03/2018

Anticipated restriction: Open


28/02/2018 - Two year contract extension of the Schools Nursing Contract

The Acting Director of Public Health will be asked to approve the extension of the contract.

Decision Maker: Director of Adult Social Care and Health

Decision due date: Not before 29/03/2018

Lead officer: Michelle Moreland

Notice of decision: 28/02/2018

Anticipated restriction: Open


28/02/2018 - Integrated Community Equipment Service

Cabinet will be asked to approve the decision for the Council to join an Integrated Community Equipment Service (ICES) with BHR health and social care partners which will be commissioned and hosted by the London Borough of Redbridge.

 

Decision Maker: Cabinet

Decision due date: 11/04/2018

Lead officer: Laura Osborn

Notice of decision: 28/02/2018

Anticipated restriction: Open


28/02/2018 - Two year contract extension of the adult drugs and alcohol treatment and recovery service contract

The Acting Director of Public Health will be asked to approve the extension of the contract for a period of two years.

Decision Maker: Director of Public Health (Interim)

Decision due date: Not before 29/03/2018

Wards affected: (All Wards);

Lead officer: Daren Mulley

Notice of decision: 28/02/2018

Anticipated restriction: Open


22/02/2018 - 2017/2018 Beehive Court Award of Contract Phase 2

The Director of Neighbourhoods will be asked to award the 2017/2018 Beehive Court Phase 2 contract - remodelling

Decision Maker: Director Neighbourhoods

Decision due date: Not before 22/03/2018

Lead officer: Ian Brady

Notice of decision: 22/02/2018

Anticipated restriction: Part exempt  - view reasons


06/02/2018 - Two year contract extension of the adult drugs and alcohol treatment and recovery service contract

The Acting Director of Public Health will be asked to approve the extension of the contract.

Decision Maker: Director of Public Health (Interim)

Decision due date: Not before 29/03/2018

Lead officer: Daren Mulley

Notice of decision: 06/02/2018

Anticipated restriction: Open


06/02/2018 - Extensions and alterations to Brady Primary School to accommodate a 1FE expansion

The Director will be asked to give Authority to award the contract.

 

Decision Maker: Director of Children's Services

Decision due date: Not before 12/04/2018

Lead officer: Andy Skeggs

Notice of decision: 06/02/2018

Anticipated restriction: Open


02/02/2018 - Publication and adoption of the London Borough of Havering's Air Quality Action Plan

Cabinet will be asked to approve the London Borough Of Havering’s finalized Air Quality Action Plan (AQAP),which has been out for public consultation in draft form, following Cabinet’s decision in December 2017 to approve the draft AQAP  for public consultation.

 

Decision Maker: Cabinet

Decision due date: 13/06/2018

Notice of decision: 02/02/2018

Anticipated restriction: Open


02/02/2018 - 12 HRA Site Regeneration - Making of the CPO

Decision Maker: Cabinet

Decision due date: 14/03/2018

Notice of decision: 02/02/2018

Anticipated restriction: Part exempt


08/01/2018 - Replacement of Library Management System.

The Chief Operating Officer will be asked to approve the call off from the Library Management Platform framework awarded by the London Borough Of Sutton.

 

Decision Maker: Chief Operating Officer

Decision due date: Not before 19/04/2018

Lead officer: Alexis Wainwright

Notice of decision: 08/01/2018

Anticipated restriction: Open


26/10/2017 - Mercury Land Holdings North Street (Hornchurch) Business Case

The Leader of the Council will be asked to approve the Business Plan for Mercury Land Holdings and the Business Case for 75 North Street, Hornchurch

 

Decision Maker: Leader of the Council

Decision due date: Not before 15/03/2018

Lead officer: Chris Hilton

Notice of decision: 26/10/2017

Reason for urgency:
This matter was not added to the formal Forward Plan issued on 5th October, 2017 as it was not finalised at that time. However, the notice period given to the public is 28 in accordance with the law.

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest to publish all the documentation as it is commercially sensitive and may affect the Council and or businesses


05/10/2017 - Extension of Existing Domestic and Commercial for S&F Services Limited

The Director will be asked to approve:

 

·       (retrospectively) the extension of the contact with S&F Limited until 31 March 2018 as provided in the original contract and

·       an additional 11 months extension, on the original terms and conditions, to provide continuity of service until the new contracts start.

 

The extension is at current tendered rates; there is no cost premium to the extensions other than the existing contractual provision for annual RPI adjustments.

This decision needs to be expedited to ensure continuity of provision.

 

Decision Maker: Director Neighbourhoods

Decision due date: Not before 08/03/2018

Lead officer: Kevin Hazlewood

Notice of decision: 05/10/2017

Reason for urgency:
This matter has been added to the Forward Plan under the general exception provisions. It was not possible to give the full 28 days notice on this matter as the contract and extension are needed urgently to ensure the continuity of gas provision due to delays regarding the new contracts which have been subject to prior decisions.

Anticipated restriction: Part exempt  - view reasons


05/10/2017 - Extension of Existing Domestic and Commercial for Quality Heating Services Limited

The Director of Neighbourhoods will be asked to approve existing contracts for a period of 11 months.

 

The cost of the 11 month extension is £687,500 there is no impact on the  existing budget, the extension is required as soon as possible due to a delay in the procurement of the new contracts. 

 

Decision Maker: Director Neighbourhoods

Decision due date: Not before 08/03/2018

Wards affected: (All Wards);

Lead officer: Kevin Hazlewood

Notice of decision: 05/10/2017

Reason for urgency:
This matter has been added to the Forward Plan under the general exception provisions. It was not possible to give the full 28 days notice on this matter as the contract extension is needed urgently to ensure the staus quo is maintained as a result of delays in the procurement process regarding the new contracts.

Anticipated restriction: Part exempt  - view reasons


12/09/2017 - Restrictions on Alcohol Consumption in Romford Town Centre

Cabinet will be asked to approve the proposed Romford Town Centre Public Space Protection Order (PSPO).

Decision Maker: Cabinet

Decision due date: 20/09/2017

Lead officer: Damien Ghela

Notice of decision: 12/09/2017

Anticipated restriction: Open


07/09/2017 - The award of a concession contract to a supplier to deliver a town centre Wi - Fi Network in Havering

Decision Maker: Chief Executive

Decision due date: Not before 15/03/2018

Notice of decision: 07/09/2017

Anticipated restriction: Part exempt  - view reasons


07/09/2017 - Children's Direct Payment policy and Personal budget policy

Cabinet will be asked to approve the Children’s Direct Payments and Personal Budget Policy.

 

Decision Maker: Cabinet

Decision due date: 11/04/2018

Lead officer: Priti Gabberia

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Romford Business Improvement District Proposal

Cabinet will be asked to approve a proposal from the Romford Town Management Partnership (RTMP) to proceed to ballot regarding the creation of a Business Improvement District for Romford

Decision Maker: Cabinet

Decision due date: 11/04/2018

Lead officer: Helen Payne

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Social Cohesion Strategy

Cabinet will be asked to agree the Council’s new Social Cohesion Strategy.

 

Decision Maker: Cabinet

Decision due date: 13/06/2018

Lead officer: Vernal Scott

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Developing the Local Voluntary and Community Sector

Cabinet will be asked to approve the allocation of the remaining Performance Reward Grant.

 

Decision Maker: Cabinet

Decision due date: 13/06/2018

Lead officer: Jerry Haley

Notice of decision: 07/09/2017

Anticipated restriction: Open


03/08/2017 - Mead Primary School. Expansion of Infants School (KS1) by One Form of Entry, expansion of Nursery and reclassification of Additional Resource Provision

The Director of Children’s Services will be asked to make an award of contract.

Decision Maker: Director Children's Services

Decision due date: Not before 08/03/2018

Lead officer: Andy Skeggs

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - Restrictions on Alcohol Consumption in Romford Town Centre

Cabinet will be asked to approve of the Public Space Protection (Romford Town Centre) Order No.1 of 2017.

Decision Maker: Cabinet

Decision due date: 20/09/2017

Lead officer: Diane Egan

Notice of decision: 03/08/2017

Anticipated restriction: Open


05/07/2017 - James Oglethorpe School - Authority to award a negotiated contract for the construction of new nursery and further internal refurbishments to existing school to complete the expansion to two forms of entry.

The Director of Children’s Services will be asked to give authority to negotiate and award the contract for this project..

 

Decision Maker: Director Children's Services

Decision due date: Not before 08/03/2018

Lead officer: Andy Skeggs

Notice of decision: 05/07/2017

Anticipated restriction: Open


05/07/2017 - Dame Tipping School - Proposed demolition and removal of two dilapidated classrooms and replacement in modular construction

The Director of Children’s Services will be asked to give authority to award the contract for this project.

 

 

Decision Maker: Director Children's Services

Decision due date: Not before 08/03/2018

Lead officer: Andy Skeggs

Notice of decision: 05/07/2017

Anticipated restriction: Open


07/06/2017 - Green Infrastructure Strategy    Item Deferred

Cabinet will be asked to approve the Havering Green Infrastructure Strategy.

Decision Maker: Cabinet

Decision due date: 11/10/2017

Lead officer: Bob Flindall

Notice of decision: 07/06/2017

Anticipated restriction: Open


20/03/2017 - Construction of new nursery at Towers Infant School

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 08/03/2018

Lead officer: Andy Skeggs

Notice of decision: 20/03/2017

Anticipated restriction: Open


20/03/2017 - Two classroom extension and staffroom infill to Whybridge Infants School

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 08/03/2018

Lead officer: Andy Skeggs

Notice of decision: 20/03/2017

Anticipated restriction: Open


22/02/2017 - Rainham and Beam Park Housing Zone - Appointment of a Joint Venture Development Partner.

Decision Maker: Cabinet

Decision due date: 13/12/2017

Lead officer: Christopher Barter

Notice of decision: 22/02/2017

Anticipated restriction: Part exempt  - view reasons


07/02/2017 - Proposed Land Acquisition in Hornchurch    Item Deferred

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: Garry Green

Notice of decision: 07/02/2017

Anticipated restriction: Part exempt  - view reasons


14/10/2016 - Frances Bardsley Academy. Authority to enter in to a contract for the construction of single storey building for Medical A P

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
the information will contain details of the financial affairs of a business which are exempt from public disclosure


14/10/2016 - Broadford Primary School. Authority to enter in to a contract for the construction of double storey building for a 1FE expansion

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
the information will likely disclose the financial affairs of a business which is exempt from public disclosure


14/10/2016 - Crownfield Infants School. Authority to enter in to a contract for the construction of single storey building for a 1FE expansion

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The information would likely disclose the financial affairs of a business which is exempt from public disclosure


14/10/2016 - Crownfield Nursery. Award of contract for the construction of single storey building for a 1FE expansion

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The information will likely disclose the financial affairs of a business which are exempt from public disclosure


14/10/2016 - Towers Nursery. Award of contract for the construction of single storey building

Decision Maker: Chief Executive

Decision due date: Not before 19/01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The information will likely disclose the financial affairs of a business which are exempt from public disclosure


11/10/2016 - Extension of the scope of the Development Services Agreement with Network Rail for the completion of the Beam Park GRIP+ process.

Decision Maker: Director of Neighbourhoods

Decision due date: Not before 15/12/2016

Lead officer: Christopher Barter

Notice of decision: 11/10/2016


19/09/2016 - White Hart Lane Development

The Deputy Leader and Lead Member for Housing will be asked to give approval to enter into a formal contract for Works, for construction of new-build housing units on Council-owned land at White Hart Lane, Collier Row.

Decision Maker: Cabinet Member for Housing

Decision due date: Not before 03/05/2018

Lead officer: Mark Howard

Notice of decision: 19/09/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest for certain documents to be published as they are commercially sensitive and it may affect the council and or local businesses.


13/07/2016 - Award of LGfl contract

Decision Maker: Managing Director, One Source

Decision due date: Not before 15/12/2016

Lead officer: Daniel Pluck

Notice of decision: 13/07/2016

This decision will be taken under urgency procedures.

Reason for urgency:
Due to operational reasons it is necessary for the executive decision to be authorised as soon as practically possible. To not do so could hamper operational ICT delivery


08/06/2016 - Implementation of proposals to create Additionally Resourced Provision at Clockhouse Primary School, Hall Mead and Redden Court Secondary Schools

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 08/07/2016

Lead officer: Pooneeta Mahadeo

Notice of decision: 08/06/2016


02/06/2016 - Pre-contract award for works associated with delivery of TfL Crossrail Complementary Measures investment at Harold Wood Station

Decision Maker: Director Neighbourhoods

Decision due date: Not before 02/07/2016

Notice of decision: 02/06/2016


21/03/2016 - Loan to Mercury Land Holdings for the acquisition of an intended market rental scheme.

Decision Maker: Leader of the Council

Decision due date: Not before 21/04/2016

Lead officer: Mike Board

Notice of decision: 21/03/2016

Anticipated restriction: Fully exempt  - view reasons


30/10/2015 - Award of contract for Napier and New Plymouth Winter Gardens and Associated Works

Decision Maker: Cabinet Member for Housing

Decision due date: Not before 10/11/2014

Lead officer: Kevin Hazlewood

Notice of decision: 10/10/2014

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercial sensitivity


30/10/2015 - Internal Communal Decorations in Various Blocks - 2014/15 Capital Programme

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 09/11/2014

Lead officer: Kevin Hazlewood

Notice of decision: 09/10/2014

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
The Executive Decision will be Exeempt due to commercial sensistivity


30/10/2015 - External Decoration to Various Properties 2014/15 Capital Programme

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 17/10/2014

Lead officer: Kevin Hazlewood

Notice of decision: 04/09/2014

Anticipated restriction: Fully exempt  - view reasons


26/10/2015 - Section 75 Partnership Agreement for Mental Health Services

Decision Maker: Leader of the Council

Decision due date: Not before 01/03/2016

Lead officer: Acting Director-Adult Services

Notice of decision: 26/10/2015


21/10/2015 - Award of contract for the provision of Occupational Health and Employee Assistance Programme services

Decision Maker: Managing Director, One Source

Decision due date: Not before 21/11/2015

Lead officer: Mark Porter

Notice of decision: 21/10/2015

Anticipated restriction: Part exempt  - view reasons


16/09/2015 - Extension of two contracts for gas servicing, maintenance and installation and one contract for electrical services in Council housing for a period of one year

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 16/10/2015

Lead officer: Kevin Hazlewood

Notice of decision: 16/09/2015

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Commercial sensistivity


24/04/2015 - Pre Tender Report - Dewsbury

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 24/05/2015

Lead officer: Keith Andrews

Notice of decision: 24/04/2015


20/01/2015 - A policy outlining subsistence rates for families with No Recourse to Public Funding (NRPF) in the London Borough of Havering

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 20/02/2015

Lead officer: Carol Carruthers

Notice of decision: 20/01/2015


08/12/2014 - Authorisation to enter into a building contract for the expansion of Parsonage Farm Primary School.

Decision Maker: Deputy Chief Executive - Communities & Resources

Decision due date: Not before 08/01/2015

Lead officer: Andy Skeggs

Notice of decision: 08/12/2014


09/07/2014 - Authorisation to enter into contract for the expansion of Crowlands Primary School

Decision Maker: Joint Managing Director, oneSource

Decision due date: Not before 09/08/2014

Lead officer: Andy Skeggs

Notice of decision: 09/07/2014


18/02/2013 - Romford Major Scheme- Approval of Scheme Design

Decision Maker: Cabinet Member for Community Empowerment

Decision due date: Not before 01/04/2013

Lead officer: Suzanne Cawthorne

Notice of decision: 18/02/2013