13/11/2017 - RAINHAM AND BEAM PARK HOUSING ZONE - A1306 BEAM PARKWAY

The Leader of the Council will be asked to approve the Housing Zone Funding for the A1306 Beam Parkway project which is a key component of the Rainham and Beam Park Housing Zone.

 

Decision Maker: Leader of the Council

Decision due date: Not before 30/11/2017

Lead officer: Chris Smart

Notice of decision: 13/11/2017

Reason for urgency:
This matter is being added by way of general exception. The A1306 Beam Parkway project is a key component of the Rainham and Beam Park Housing Zone. The contractual documents for GLA Housing Zone funding have been working through the due diligence process and will be ready for signing in December. However, the GLA have announced the end of the Housing Zone programme and that all outstanding funding agreements are to be completed and signed by the 31st Jan 2018 after which no further funding will be available. There is an imperative to complete this funding agreement as early as possible before that date, before the end of November 2017, as there is an overprogramming of available funding which may put funding for competing projects at risk. This matter is therefore to be dealt with urgently with a decision not before 30th November, 2017, which does not allow the full 28 day notice period to members of the public.

Anticipated restriction: Part exempt

Explanation of anticipated restriction:
It will not be in the public interest to publish the commercially sensitive information as it may affect local businesses and or the Local Authority.


09/11/2017 - Financial Inclusion Strategy

Cabinet will be asked to approve the Financial Inclusion Strategy to be implemented across the Borough.

Decision Maker: Cabinet

Decision due date: 07/02/2018

Lead officer: Phillipa Brent-Isherwood

Notice of decision: 09/11/2017

Anticipated restriction: Open


09/11/2017 - Publication of the London Borough of Havering's Air Quality Action Plan 2018-2023 subject to consultation

Cabinet will be asked to approve the London Borough of Havering’s draft  Air Quality Action Plan ready for formal consultation.

 

Decision Maker: Cabinet

Decision due date: 13/12/2017

Lead officer: MarieClaire Irvine

Notice of decision: 09/11/2017

Anticipated restriction: Open


09/11/2017 - Award of Contract for the Provision of Care and Support Services in Extra Schemes

Cabinet Member for Adult Social Care will be asked to approve the award of contract.

Decision Maker: Cabinet Member for Adult Social Services and Health

Decision due date: Not before 18/12/2017

Lead officer: Daren Mulley

Notice of decision: 09/11/2017

Anticipated restriction: Open


09/11/2017 - Regeneration Programme - Governance and Overall Implications

Cabinet will be asked to:

 

·       Approve the proposed governance structure aimed at ensuring that the Council’s interests are protected.

 

·       Note the total impact on the MTFS of the Council’s participation in three housing development joint ventures (Beam Park Rainham, Bridge Close, 12 HRA sites) and of Mercury Land Holdings, approval to which is sought separately in the individual Cabinet papers on each. 

 

Decision Maker: Cabinet

Decision due date: 17/01/2018

Lead officer: Chris Hilton

Notice of decision: 09/11/2017

Anticipated restriction: Open


09/11/2017 - The London Borough of Havering on behalf of the London Libraries Consortium seeks approval to extend the Axiell Ltd contract for a period twelve months.

The Chief operating Officer will be asked to approve the extension of the contact with Axiell Ltd, the current supplier of the Library Management System for a period twelve months, as agreed by the Board of the London Libraries Consortium of which Havering is a member.

 

Decision Maker: Chief Operating Officer

Decision due date: Not before 07/12/2017

Lead officer: Alexis Wainwright

Notice of decision: 09/11/2017

Anticipated restriction: Open


26/10/2017 - Proposed Land Purchase Option to be granted to Mercury Land Holdings

To approve the terms of a Land Purchase Option to be granted to Mercury Land Holdings

Decision Maker: Leader of the Council

Decision due date: Not before 23/11/2017

Notice of decision: 26/10/2017

Reason for urgency:
This matter was not on the formal Forward Plan published on 5th October, 2017. However, the requisite notice period has been given

Anticipated restriction: Part exempt  - view reasons


26/10/2017 - Insurance Contract Extension

To approve the six month main insurance contract extension from 1st January 2018 to facilitate a joint procurement process with London Borough of Bexley.

 

Decision Maker: Statutory Section 151 Officer Finance

Decision due date: Not before 23/11/2017

Lead officer: Paula McLoughlin

Notice of decision: 26/10/2017

Reason for urgency:
This matter was not added to the formal forward Plan when published on 5th October as it was not available. The requisite notice has nevertheless been given.

Anticipated restriction: Open


26/10/2017 - Mercury Land Holdings North Street (Hornchurch) Business Case

The Leader of the Council will be asked to Approve the Mercury Land Holdings Business Case for 75 North Street , Hornchurch

 

Decision Maker: Leader of the Council

Decision due date: Not before 23/11/2017

Lead officer: Chris Hilton

Notice of decision: 26/10/2017

Reason for urgency:
This matter was not added to the formal Forward Plan issued on 5th October, 2017 as it was not finalised at that time. However, the notice period given to the public is 28 in accordance with the law.

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest to publish all the documentation as it is commercially sensitive and may affect the Council and or businesses


20/10/2017 - Implementation of Phase 4 expansion programme - Mead Primary School expansion

The Cabinet Lead member will be asked to approve the Phase 4 expansion for Mead Primary School.

Decision Maker: Cabinet Member for Children & Learning

Decision due date: 23/11/2017

Lead officer: Pooneeta Mahadeo

Notice of decision: 20/10/2017

This decision will be taken under urgency procedures.

Reason for urgency:
This matter is by way of the general exception procedure as it did not appear on the Forward plan published on 5th November. However, the full period of notice required of 28 days is given and therefore causes no prejudice.

Anticipated restriction: Open


05/10/2017 - Extension of Existing Domestic and Commercial for S&F Services Limited

The Director will be asked to approve:

 

·       (retrospectively) the extension of the contact with S&F Limited until 31 March 2018 as provided in the original contract and

·       an additional 11 months extension, on the original terms and conditions, to provide continuity of service until the new contracts start.

 

The extension is at current tendered rates; there is no cost premium to the extensions other than the existing contractual provision for annual RPI adjustments.

This decision needs to be expedited to ensure continuity of provision.

 

Decision Maker: Director Neighbourhoods

Decision due date: Not before 16/11/2017

Lead officer: Kevin Hazlewood

Notice of decision: 05/10/2017

Reason for urgency:
This matter has been added to the Forward Plan under the general exception provisions. It was not possible to give the full 28 days notice on this matter as the contract and extension are needed urgently to ensure the continuity of gas provision due to delays regarding the new contracts which have been subject to prior decisions.

Anticipated restriction: Part exempt  - view reasons


05/10/2017 - Extension of Existing Domestic and Commercial for Quality Heating Services Limited

The Director of Neighbourhoods will be asked to approve existing contracts for a period of 11 months.

 

The cost of the 11 month extension is £687,500 there is no impact on the  existing budget, the extension is required as soon as possible due to a delay in the procurement of the new contracts. 

 

Decision Maker: Director Neighbourhoods

Decision due date: Not before 16/11/2017

Wards affected: (All Wards);

Lead officer: Kevin Hazlewood

Notice of decision: 05/10/2017

Reason for urgency:
This matter has been added to the Forward Plan under the general exception provisions. It was not possible to give the full 28 days notice on this matter as the contract extension is needed urgently to ensure the staus quo is maintained as a result of delays in the procurement process regarding the new contracts.

Anticipated restriction: Part exempt  - view reasons


05/10/2017 - Broadford Primary School. Construction of new building to accommodate the expansion of the school from 2FE to 4FE as a phased programme.

The Director of Children’s Services will be asked to give authority to award the contract for 1FE expansion including negotiation for a further 1FE expansion.

Decision Maker: Director of Children's Services

Decision due date: Not before 16/11/2017

Lead officer: Andy Skeggs

Notice of decision: 05/10/2017


25/09/2017 - Update on the Sport & Leisure Management Ltd (SLM) Contract and Financial Implications.

Cabinet will be asked to:

  1. note the progress made under the new contract with SLM
  2. note the updated financial implications
  3. approve the investment (previously agreed by Cabinet in July 2016) in Central Park Leisure Centre and the new build Hornchurch Centre to be referred to Council for inclusion in the capital programme

 

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: Guy Selfe

Notice of decision: 25/09/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest to publish financial information as it could affect businesses and/ or the Local Authority.


12/09/2017 - Restrictions on Alcohol Consumption in Romford Town Centre

Cabinet will be asked to approve the proposed Romford Town Centre Public Space Protection Order (PSPO).

Decision Maker: Cabinet

Decision due date: 20/09/2017

Lead officer: Damien Ghela

Notice of decision: 12/09/2017

Anticipated restriction: Open


07/09/2017 - Outcome of Consultation on the Draft Adult Social Care & Support Planning Policy for Approval

Cabinet will be asked to consider the outcome of consultation on the draft Adult Social Care & Support Planning policy and approve the policy.

Decision Maker: Cabinet

Decision due date: 13/12/2017

Wards affected: (All Wards);

Lead officer: Alan Grierson

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Housing Revenue Account (HRA) Business Plan update

Cabinet will be asked to approve the refresh of the HRA Business Plan.  The report will also advise Cabinet of the financial impact of the regeneration proposals for the delivery of new affordable homes for local people.

 

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: Neil Stubbings

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - The award of a concession contract to a supplier to deliver a town centre Wi - Fi Network in Havering

Decision Maker: Chief Executive

Decision due date: Not before 16/11/2017

Notice of decision: 07/09/2017

Anticipated restriction: Part exempt  - view reasons


07/09/2017 - Children's Direct Payment policy and Personal budget policy

Cabinet will be asked to approve the Children’s Direct Payments and Personal Budget Policy.

 

Decision Maker: Cabinet

Decision due date: 13/12/2017

Lead officer: Priti Gabberia

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Romford Business Improvement District Proposal

Cabinet will be asked to approve a proposal from the Romford Town Management Partnership (RTMP) to proceed to ballot regarding the creation of a Business Improvement District for Romford

Decision Maker: Cabinet

Decision due date: 17/01/2018

Lead officer: Helen Payne

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Social Cohesion Strategy 2017 - 2021

Cabinet will be asked to agree the Council’s new Social Cohesion Strategy 2017 - 2021

 

Decision Maker: Cabinet

Decision due date: 17/01/2018

Lead officer: Vernal Scott

Notice of decision: 07/09/2017

Anticipated restriction: Open


07/09/2017 - Developing the Local Voluntary and Community Sector

Cabinet will be asked to approve the allocation of the remaining Performance Reward Grant.

 

Decision Maker: Cabinet

Decision due date: 17/01/2018

Lead officer: Jerry Haley

Notice of decision: 07/09/2017

Anticipated restriction: Open


05/09/2017 - Update on the Council's MTFS and Budget for 2018/19

Cabinet will be asked to consider an update on the MTFS following the Autumn Budget Statement and to consider a capital programme update.

In addition, approval will be requested for the London Borough of Havering to join the London Business Rate Pilot.

Decision Maker: Cabinet

Decision due date: 13/12/2017

Lead officer: Debbie Middleton

Notice of decision: 05/09/2017

Anticipated restriction: Open


03/08/2017 - Mead Primary School. Expansion of Infants School (KS1) by One Form of Entry, expansion of Nursery and reclassification of Additional Resource Provision

The Director of Children’s Services will be asked to make an award of contract.

Decision Maker: Director Children's Services

Decision due date: Not before 22/11/2017

Lead officer: Andy Skeggs

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - Land of the Fanns Landscape Partnership

Cabinet will be asked to:

 

  1. Agree  that the Council enters into a Partnership Agreement with others to deliver the Land of the Fanns Landscape Partnership scheme

 

  1. Agree that the Council accepts a grant of £1.37m from Heritage Lottery Fund in its capacity as  Accountable Body for the  Land of the Fanns Landscape Partnership scheme

 

Decision Maker: Cabinet

Decision due date: 11/10/2017

Lead officer: Chris Smart

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - Restrictions on Alcohol Consumption in Romford Town Centre

Cabinet will be asked to approve of the Public Space Protection (Romford Town Centre) Order No.1 of 2017.

Decision Maker: Cabinet

Decision due date: 20/09/2017

Lead officer: Diane Egan

Notice of decision: 03/08/2017

Anticipated restriction: Open


06/07/2017 - Briar Road Tender Award Update

The Leader of the Council will be asked to approve an update in the Briar Road Tender Award as appropriate.

Decision Maker: Leader of the Council

Decision due date: Not before 16/11/2017

Lead officer: Mark Howard

Notice of decision: 06/07/2017

Anticipated restriction: Part exempt  - view reasons


05/07/2017 - 2017/2018 Beehive Court Award of Contract Phase 2

The Director of Neighbourhoods will be asked to award the contract for the 2017/18 Bee Hive Court Development following a full procurement exercise.

Decision Maker: Director Neighbourhoods

Decision due date: Not before 16/11/2017

Lead officer: Kevin Hazlewood

Notice of decision: 05/07/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest to publish information that is commercially sensitive as it may affect local businesses and or the Council


05/07/2017 - Joint Commissioning Strategy

Cabinet will be asked to approve the Joint Commissioning Strategy

 

Decision Maker: Cabinet

Decision due date: 13/12/2017

Wards affected: (All Wards);

Lead officer: John Green

Notice of decision: 05/07/2017

Anticipated restriction: Open


05/07/2017 - James Oglethorpe School - Authority to award a negotiated contract for the construction of new nursery and further internal refurbishments to existing school to complete the expansion to two forms of entry.

The Director of Children’s Services will be asked to give authority to negotiate and award the contract for this project..

 

Decision Maker: Director Children's Services

Decision due date: Not before 16/11/2017

Lead officer: Andy Skeggs

Notice of decision: 05/07/2017

Anticipated restriction: Open


05/07/2017 - Dame Tipping School - Proposed demolition and removal of two dilapidated classrooms and replacement in modular construction

The Director of Children’s Services will be asked to give authority to award the contract for this project.

 

 

Decision Maker: Director Children's Services

Decision due date: Not before 16/11/2017

Lead officer: Andy Skeggs

Notice of decision: 05/07/2017

Anticipated restriction: Open


07/06/2017 - Green Infrastructure Strategy    Item Deferred

Cabinet will be asked to approve the Havering Green Infrastructure Strategy.

Decision Maker: Cabinet

Decision due date: 11/10/2017

Lead officer: Bob Flindall

Notice of decision: 07/06/2017

Anticipated restriction: Open


07/06/2017 - Mercury Land Holding Business Plan Update

Cabinet will  be asked to approve the Mercury Land Holding Business Plan.

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: Chris Hilton

Notice of decision: 07/06/2017

Anticipated restriction: Part exempt  - view reasons


11/05/2017 - Rainham Village Primary School - contract for school expansion.

Further to the Cabinet decision in October, 2016, the Director of Children’s Services will be asked to give authority to enter into a contract for the construction of a single storey extension of 3 classrooms for a 1FE expansion at Rainham Village Primary School.

 

This matter was not available to publish at the time of the June 2017 Forward Plan.  It is published giving the full 28 days’ notice period to members of the public.

Decision Maker: Director Children's Services

Decision due date: Not before 16/11/2017

Wards affected: Rainham & Wennington;

Lead officer: Andy Skeggs

Notice of decision: 11/05/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest to publish information which is commercially sensitive and may affect local businesses or the Council.


04/05/2017 - Selection and Appointment of a Joint Venture Partner to Deliver the London Borough of Havering's Estate Regeneration Programme

Cabinet will be asked to approve the selection and appointment of a Joint Venture Partner to deliver the London Borough of Havering’s Estate Regeneration Programme.

 

 

Decision Maker: Cabinet

Decision due date: 17/01/2018

Wards affected: (All Wards);

Lead officer: Neil Stubbings

Notice of decision: 04/05/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
it will not be in the public interest to publish part of this report as it is commercially sensitive and it may affect a business(es) or the local authority.


25/04/2017 - Private Rented Sector Landlord Licensing designation, implementation and enforcement

Following the decision taken at Cabinet in January, 2017 (Consultation on Proposed Licensing Schemes for HMOs and Other Private Rented Housing Sector), Cabinet will be asked to give approval to the proposed Licensing Scheme and agree operational arrangements, namely partnership with Newham.

Cabinet will also be asked to adopt new fixed penalty arrangements.

Decision Maker: Cabinet

Decision due date: 11/10/2017

Wards affected: (All Wards);

Lead officer: David Thrale

Notice of decision: 25/04/2017

Anticipated restriction: Open


05/04/2017 - Disposal of Land at Hilldene North, Harold Hill

Decision Maker: Leader of the Council

Decision due date: Not before 16/11/2017

Lead officer: Garry Green

Notice of decision: 05/04/2017

Anticipated restriction: Part exempt  - view reasons


21/03/2017 - Proposed uplift of Planning Application Fees

Decision Maker: Cabinet

Decision due date: 11/10/2017

Lead officer: Helen Oakerbee

Notice of decision: 21/03/2017

Anticipated restriction: Open


20/03/2017 - Construction of two storey extension and infill classrooms to roof at Hylands Primary School

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 16/11/2017

Lead officer: Andy Skeggs

Notice of decision: 20/03/2017

Anticipated restriction: Open


20/03/2017 - Construction of new nursery at Towers Infant School

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 16/11/2017

Lead officer: Andy Skeggs

Notice of decision: 20/03/2017

Anticipated restriction: Open


20/03/2017 - Two classroom extension and staffroom infill to Whybridge Infants School

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 16/11/2017

Lead officer: Andy Skeggs

Notice of decision: 20/03/2017

Anticipated restriction: Open


15/03/2017 - Development of land at Hilldene North, Harold Hill

Decision Maker: Leader of the Council

Decision due date: Not before 16/11/2017

Lead officer: Garry Green

Notice of decision: 15/03/2017

Anticipated restriction: Part exempt  - view reasons


06/03/2017 - Social Care Case Management System Procurement

Cabinet will be asked to approve the Social Care Case management System Procurement.

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: rob allerton

Notice of decision: 06/03/2017

Anticipated restriction: Part exempt  - view reasons


06/03/2017 - Bridge Close - Business Plan and Joint Venture Partnership Agreement

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: Neil Stubbings

Notice of decision: 06/03/2017

Anticipated restriction: Part exempt  - view reasons


24/02/2017 - To extend the Healthy Child Programme contract by two years as per the condition of the contract

Decision Maker: Director of Public Health (Interim)

Decision due date: Not before 29/06/2017

Notice of decision: 24/02/2017


22/02/2017 - Rainham and Beam Park Housing Zone - Appointment of a Joint Venture Development Partner.

Decision Maker: Cabinet

Decision due date: 13/12/2017

Lead officer: Christopher Barter

Notice of decision: 22/02/2017

Anticipated restriction: Part exempt  - view reasons


07/02/2017 - Proposed Land Acquisition in Hornchurch    Item Deferred

Decision Maker: Cabinet

Decision due date: 15/11/2017

Lead officer: Garry Green

Notice of decision: 07/02/2017

Anticipated restriction: Part exempt  - view reasons


14/10/2016 - Frances Bardsley Academy. Authority to enter in to a contract for the construction of single storey building for Medical A P

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
the information will contain details of the financial affairs of a business which are exempt from public disclosure


14/10/2016 - Broadford Primary School. Authority to enter in to a contract for the construction of double storey building for a 1FE expansion

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
the information will likely disclose the financial affairs of a business which is exempt from public disclosure


14/10/2016 - Crownfield Infants School. Authority to enter in to a contract for the construction of single storey building for a 1FE expansion

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The information would likely disclose the financial affairs of a business which is exempt from public disclosure


14/10/2016 - Crownfield Nursery. Award of contract for the construction of single storey building for a 1FE expansion

Decision Maker: Chief Executive

Decision due date: 01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The information will likely disclose the financial affairs of a business which are exempt from public disclosure


14/10/2016 - Towers Nursery. Award of contract for the construction of single storey building

Decision Maker: Chief Executive

Decision due date: Not before 19/01/2017

Lead officer: Andy Skeggs

Notice of decision: 14/10/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The information will likely disclose the financial affairs of a business which are exempt from public disclosure


11/10/2016 - Extension of the scope of the Development Services Agreement with Network Rail for the completion of the Beam Park GRIP+ process.

Decision Maker: Director of Neighbourhoods

Decision due date: Not before 15/12/2016

Lead officer: Christopher Barter

Notice of decision: 11/10/2016


19/09/2016 - White Hart Lane Development

The Deputy Leader and Lead Member for Housing will be asked to give approval to enter into a formal contract for Works, for construction of new-build housing units on Council-owned land at White Hart Lane, Collier Row.

Decision Maker: Cabinet Member for Housing

Decision due date: Not before 16/11/2017

Lead officer: Mark Howard

Notice of decision: 19/09/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
It will not be in the public interest for certain documents to be published as they are commercially sensitive and it may affect the council and or local businesses.


13/07/2016 - Award of LGfl contract

Decision Maker: Managing Director, One Source

Decision due date: Not before 15/12/2016

Lead officer: Daniel Pluck

Notice of decision: 13/07/2016

This decision will be taken under urgency procedures.

Reason for urgency:
Due to operational reasons it is necessary for the executive decision to be authorised as soon as practically possible. To not do so could hamper operational ICT delivery


08/06/2016 - Implementation of proposals to create Additionally Resourced Provision at Clockhouse Primary School, Hall Mead and Redden Court Secondary Schools

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 08/07/2016

Lead officer: Pooneeta Mahadeo

Notice of decision: 08/06/2016


02/06/2016 - Pre-contract award for works associated with delivery of TfL Crossrail Complementary Measures investment at Harold Wood Station

Decision Maker: Director Neighbourhoods

Decision due date: Not before 02/07/2016

Notice of decision: 02/06/2016


21/03/2016 - Loan to Mercury Land Holdings for the acquisition of an intended market rental scheme.

Decision Maker: Leader of the Council

Decision due date: Not before 21/04/2016

Lead officer: Mike Board

Notice of decision: 21/03/2016

Anticipated restriction: Fully exempt  - view reasons


30/10/2015 - Award of contract for Napier and New Plymouth Winter Gardens and Associated Works

Decision Maker: Cabinet Member for Housing

Decision due date: Not before 10/11/2014

Lead officer: Kevin Hazlewood

Notice of decision: 10/10/2014

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercial sensitivity


30/10/2015 - Internal Communal Decorations in Various Blocks - 2014/15 Capital Programme

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 09/11/2014

Lead officer: Kevin Hazlewood

Notice of decision: 09/10/2014

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
The Executive Decision will be Exeempt due to commercial sensistivity


30/10/2015 - External Decoration to Various Properties 2014/15 Capital Programme

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 17/10/2014

Lead officer: Kevin Hazlewood

Notice of decision: 04/09/2014

Anticipated restriction: Fully exempt  - view reasons


26/10/2015 - Section 75 Partnership Agreement for Mental Health Services

Decision Maker: Leader of the Council

Decision due date: Not before 01/03/2016

Lead officer: Acting Director-Adult Services

Notice of decision: 26/10/2015


21/10/2015 - Award of contract for the provision of Occupational Health and Employee Assistance Programme services

Decision Maker: Managing Director, One Source

Decision due date: Not before 21/11/2015

Lead officer: Mark Porter

Notice of decision: 21/10/2015

Anticipated restriction: Part exempt  - view reasons


16/09/2015 - Extension of two contracts for gas servicing, maintenance and installation and one contract for electrical services in Council housing for a period of one year

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 16/10/2015

Lead officer: Kevin Hazlewood

Notice of decision: 16/09/2015

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Commercial sensistivity


24/04/2015 - Pre Tender Report - Dewsbury

Decision Maker: Deputy Chief Executive Children, Adults and Housing

Decision due date: Not before 24/05/2015

Lead officer: Keith Andrews

Notice of decision: 24/04/2015


20/01/2015 - A policy outlining subsistence rates for families with No Recourse to Public Funding (NRPF) in the London Borough of Havering

Decision Maker: Cabinet Member for Children & Learning

Decision due date: Not before 20/02/2015

Lead officer: Carol Carruthers

Notice of decision: 20/01/2015


08/12/2014 - Authorisation to enter into a building contract for the expansion of Parsonage Farm Primary School.

Decision Maker: Deputy Chief Executive - Communities & Resources

Decision due date: Not before 08/01/2015

Lead officer: Andy Skeggs

Notice of decision: 08/12/2014


09/07/2014 - Authorisation to enter into contract for the expansion of Crowlands Primary School

Decision Maker: Joint Managing Director, oneSource

Decision due date: Not before 09/08/2014

Lead officer: Andy Skeggs

Notice of decision: 09/07/2014


18/02/2013 - Romford Major Scheme- Approval of Scheme Design

Decision Maker: Cabinet Member for Community Empowerment

Decision due date: Not before 01/04/2013

Lead officer: Suzanne Cawthorne

Notice of decision: 18/02/2013